/** \page page_scheduling Graph Scheduling
 | 
						|
 | 
						|
This document tries to explain how the PipeWire graph is scheduled.
 | 
						|
 | 
						|
Graph are constructed from linked nodes together with their ports. This
 | 
						|
results in a dependency graph between nodes. Special care is taken for
 | 
						|
loopback links so that the graph remains a directed graph.
 | 
						|
 | 
						|
 | 
						|
# Nodes
 | 
						|
 | 
						|
Nodes are objects with 0 or more input and output ports.
 | 
						|
 | 
						|
Each node also has:
 | 
						|
 | 
						|
- an eventfd to signal the node that it can start processing
 | 
						|
- an activation record that lives in shared memory with memfd.
 | 
						|
 | 
						|
```
 | 
						|
   eventfd
 | 
						|
  +-^---------+
 | 
						|
  |           |
 | 
						|
 in          out
 | 
						|
  |           |
 | 
						|
  +-v---------+
 | 
						|
    activation {
 | 
						|
      status:OK,        // bitmask of NEED_DATA, HAVE_DATA or OK
 | 
						|
      pending:0,	// number of unsatisfied dependencies to be able to run
 | 
						|
      required:0        // number of dependencies with other nodes
 | 
						|
    }
 | 
						|
```
 | 
						|
 | 
						|
The activation record has the following information:
 | 
						|
 | 
						|
 - processing state and pending dependencies. As long as there are pending dependencies
 | 
						|
   the node can not be processed. This is the only relevant information for actually
 | 
						|
   scheduling the graph and is shown in the above illustration.
 | 
						|
 - Current status of the node and profiling info (TRIGGERED, AWAKE, FINISHED, timestamps
 | 
						|
   when the node changed state).
 | 
						|
 - Timing information, mostly for drivers when the processing started, the time, duration
 | 
						|
   and rate (quantum) etc..
 | 
						|
 - Information about repositions (seek) and timebase owners.
 | 
						|
 | 
						|
 | 
						|
# Links
 | 
						|
 | 
						|
When two nodes are linked together, the output node becomes a dependency for the input
 | 
						|
node. This means the input node can only start processing when the output node is finished.
 | 
						|
 | 
						|
This dependency is reflected in the required counter in the activation record. In below
 | 
						|
illustration, B's required field is incremented with 1. The pending field is set to the
 | 
						|
required field when the graph is started. Node A will keep a list of all targets (B) that it
 | 
						|
is a dependency of.
 | 
						|
 | 
						|
This dependency update is only performed when the link is ready (negotiated) and the nodes
 | 
						|
are ready to schedule (runnable).
 | 
						|
 | 
						|
 | 
						|
```
 | 
						|
   eventfd                                eventfd
 | 
						|
  +-^---------+                          +-^---------+
 | 
						|
  |           |        link              |           |
 | 
						|
 in     A    out ---------------------> in     B    out
 | 
						|
  |           |                          |           |
 | 
						|
  +-v---------+                          +-v---------+
 | 
						|
    activation {       target              activation {
 | 
						|
      status:OK,  -------------------->      status:OK,
 | 
						|
      pending:0,                             pending:1,
 | 
						|
      required:0                             required:1
 | 
						|
    }                                      }
 | 
						|
```
 | 
						|
 | 
						|
Multiple links between A and B will only result in 1 target link between A and B.
 | 
						|
 | 
						|
 | 
						|
# Drivers
 | 
						|
 | 
						|
The graph can only run if there is a driver node that is in some way linked to an
 | 
						|
active node.
 | 
						|
 | 
						|
The driver is special because it will have to initiate the processing in the graph. It
 | 
						|
will use a timer or some sort of interrupt from hardware to start the cycle.
 | 
						|
 | 
						|
Any node can also be a candidate for a driver (when the node.driver property is true).
 | 
						|
PipeWire will select the node with the highest priority.driver property as the driver.
 | 
						|
 | 
						|
Nodes will be assigned to the driver node they will be scheduled with. Each node holds
 | 
						|
a reference to the driver and increments the required field of the driver.
 | 
						|
 | 
						|
When a node is ready to be scheduled, the driver adds the node to its list of targets
 | 
						|
and increments the required field.
 | 
						|
 | 
						|
 | 
						|
```
 | 
						|
   eventfd                                eventfd
 | 
						|
  +-^---------+                          +-^---------+
 | 
						|
  |           |        link              |           |
 | 
						|
 in     A    out ---------------------> in     B    out
 | 
						|
  |           |                          |           |
 | 
						|
  +-v---------+                          +-v---------+
 | 
						|
    activation {       target              activation {
 | 
						|
      status:OK,  -------------------->      status:OK,
 | 
						|
      pending:0,                             pending:0,
 | 
						|
      required:1                             required:2
 | 
						|
    }                                      }
 | 
						|
      |    ^                         ^
 | 
						|
      |    |                        /   /
 | 
						|
      |    |                       /   /
 | 
						|
      |    |                      /   /
 | 
						|
      |    |                     /   /
 | 
						|
      |    |                    /   /
 | 
						|
      v    |     /-------------/   /
 | 
						|
    activation {                  /
 | 
						|
      status:OK, V---------------/
 | 
						|
      pending:0,
 | 
						|
      required:2
 | 
						|
    }
 | 
						|
  +-^---------+
 | 
						|
  |           |
 | 
						|
  |   driver  |
 | 
						|
  |           |
 | 
						|
  +-v---------+
 | 
						|
   eventfd
 | 
						|
```
 | 
						|
 | 
						|
As seen in the illustration above, the driver holds a link to each node it needs to
 | 
						|
schedule and each node holds a link to the driver. Some nodes hold a link to other
 | 
						|
nodes.
 | 
						|
 | 
						|
It is possible that the driver is the same as a node in the graph (for example node A)
 | 
						|
but conceptually, the links above are still valid.
 | 
						|
 | 
						|
The driver will then start processing the graph by emitting the ready signal. PipeWire
 | 
						|
will then:
 | 
						|
 | 
						|
 - Check the previous cycle. Did it complete? Mark xrun on unfinished nodes.
 | 
						|
 - Perform reposition requests if any, timebase changes, etc..
 | 
						|
 - The pending counter of each follower node is set to the required field.
 | 
						|
 - It then loops over all targets of the driver and atomically decrements the required
 | 
						|
   field of the activation record. When the required field is 0, the eventfd is signaled
 | 
						|
   and the node can be scheduled.
 | 
						|
 | 
						|
In our example above, Node A and B will have their pending state decremented. Node A
 | 
						|
will be 0 and will be triggered first (node B has 2 pending dependencies to start with and
 | 
						|
will not be triggered yet). The driver itself also has 2 dependencies left and will not
 | 
						|
be triggered (complete) yet.
 | 
						|
 | 
						|
## Scheduling node A
 | 
						|
 | 
						|
When the eventfd is signaled on a node, we say the node is triggered and it will be able
 | 
						|
to process data. It consumes the input on the input ports and produces more data on the
 | 
						|
output ports.
 | 
						|
 | 
						|
After processing, node A goes through the list of targets and decrements each pending
 | 
						|
field (node A has a reference to B and the driver).
 | 
						|
 | 
						|
In our above example, the driver is decremented (from 2 to 1) but is not yet triggered.
 | 
						|
node B is decremented (from 1 to 0) and is triggered by writing to the eventfd.
 | 
						|
 | 
						|
## Scheduling node B
 | 
						|
 | 
						|
Node B is scheduled and processes the input from node A. It then goes through the list of
 | 
						|
targets and decrements the pending fields.  It decrements the pending field of the
 | 
						|
driver (from 1 to 0) and triggers the driver.
 | 
						|
 | 
						|
## Scheduling the driver
 | 
						|
 | 
						|
The graph always completes after the driver is triggered and scheduled. All required
 | 
						|
fields from all the nodes in the target list of the driver are now 0.
 | 
						|
 | 
						|
The driver calculates some stats about cpu time etc.
 | 
						|
 | 
						|
# Remote nodes.
 | 
						|
 | 
						|
For remote nodes, the eventfd and the activation is transfered from the server
 | 
						|
to the client.
 | 
						|
 | 
						|
This means that writing to the remote client eventfd will wake the client directly
 | 
						|
without going to the server first.
 | 
						|
 | 
						|
All remote clients also get the activation and eventfd of the peer and driver they
 | 
						|
are linked to and can directly trigger peers and drivers without going to the
 | 
						|
server first.
 | 
						|
 | 
						|
## Remote driver nodes.
 | 
						|
 | 
						|
Remote drivers start the graph cycle directly without going to the server first.
 | 
						|
 | 
						|
After they complete (and only when the profiler is active), they will trigger an
 | 
						|
extra eventfd to signal the server that the graph completed. This is used by the
 | 
						|
server to generate the profiler info.
 | 
						|
 | 
						|
*/
 |